Product Attributes
Brand: Honde
Payment Type:L/C,T/T,D/P,Paypal,Western Union
Incoterm:FOB,CFR,CIF
Min. Order:100 Set/Sets
Delivery Time:30 Days
Transportation:Ocean,Land,Air
Port:Xingang,Qingdao
Supply Ability & Additional Informations
Packaging: pallet
Productivity: 100/week
Transportation: Ocean,Land,Air
Place of Origin: Hebei
Supply Ability: 100/week
Certificate: ISO9001,CE
Port: Xingang,Qingdao
Payment Type: L/C,T/T,D/P,Paypal,Western Union
Incoterm: FOB,CFR,CIF
Delivery Time: 30 Days
Packaging & Delivery
Selling Units:Set/Sets
Package Type:pallet
Piggery Gestation Crate/stall for pigs sows
The use of pig pens can reduce the size of the pig house, facilitate feeding management and improve the environment. Different pig houses should be equipped with different pig pens. According to the structure, there are solid pig pens, fence type pig pens, integrated pig pens, sow single bar, high bed farrowing pen, high bed nursery bar, etc. According to the use, there are boar pens, breeding columns, pregnancy bars, delivery columns, nursery columns, growth and fattening columns.
Solid Rod Farrowing Stalls is made of solid rod with high quality for pigs, and plays an important role in modern pig farms. At the bottom of the farrowing pen, Pig Flooring Systems was laid, and the floor was movable. This design facilitates the cleaning of the pigsty. Our Steel Solid Rod Farrowing Stalls is made of high quality steel, made by automatic welding technology, and sprayed or galvanized on the surface. The product is resistant to corrosion, and durable. The service life is up to 15-20 years. On the Pig Crate, the Pig Nipple Drinker can be installed to provide convenient drinking water and clean drinking water for pigs.
Installation method of farrowing crates
1. Set the distance of the aisle, put the side feet on both ends of the unit, pull the positioning line, and observe whether the distance between the feet on both sides is equal, straight and not inclined.
2. Place the other side feet in turn. The distance between the horizontal side feet is the width of the floor, and the distance between the side feet and the middle feet is the length of the floor.
3. Install the floor between the side foot and the middle foot. Don't forget to tighten the screws.
4. Now observe whether the left and right columns are installed reversely, and whether they are installed horizontally and vertically.
5. Install the positioning bar, front door and rear door.
Our Company
FAQ
When can I get the price?
Within 24 hours after we get your inquiry. If you are urgent to get the price, please call me any time.
How can I get a sample to check the quality and time?
After price confirmation, you can inquire for samples to check the quality and the sampling time about 5-7 days via UPS DHL Fedex and etc.
http://www.pigfarmhb.com/